surface temperature composite decking

surface temperature composite decking

consumers must pay attention to the floor and floor heating step by
step. When installed, the surface temperature should be kept at about 18
degrees celsius. Before installation, gradually increase the
temperature of the cement ground, increase by 5 degrees per day until
the standard of about 18 degrees celsius. In the first 3 days after the
installation, continue to maintain the temperature,

days after the warming up according to the needs, and can only be
increased by 5 degrees per day. The first use of geothermal heating,
attention should be slowly warming. For the first time, three days
before the start of the heating, the temperature should gradually rise:
the first day, water temperature of 18 degrees, second days, 25 degrees,
third days, 30 degrees, fourth days can rise to normal temperature,
that is, the temperature of 45 degrees, the surface temperature of 28
degrees ~30 degrees C.

If you don't heat up too fast, the floor may crack and twist because
of expansion. After a long period of time, the geothermal heating system
should be used again, and it should be heated in accordance with the
heating procedure as it was for the first time. Two, close the
geothermal system, pay attention to gradually cool as the season
progresses, when the weather is warm,